جزئیات آگهی
آگهی مناقصه با عنوان Civil Works and Hydromechanical Equipment و با کد هزاره 5533006 در تاریخ یکشنبه، 9 مرداد 1401 در سایت ارتباط گستران هزاره ثبت شده است. این آگهی مربوط به کشور نپال و در دسته بندی پست انتقال نیرو، مشاوره برق، سایر مناقصه های برق، سایر مناقصه های ساختمان، سد و کانال، مشاوره (کلیه صنوف) انتشار یافته است
The Tamakoshi V Hydroelectric Project is proposed on the Tamakoshi River in Dolakha District of the Central Development Region of Nepal. This project was conceptualized to be developed in tandem with the Upper Tamakoshi HEP. The project was identified as best project by the Project Development Department (PDD) of Nepal Electricity Authority (NEA) during the project identification study conducted by the department. The project was initially conceptualized for 53 MW installed capacity and was upgraded to 87 MW during the feasibility study. The feasibility study of the project was conducted by the PDD of NEA and selection of the consulting firm for the detailed design of the project was initiated from the same department. During the Detailed Design, the installed capacity of project was increased to 99.8 MW through a gross head of 173.40 m and a design discharge of 66 m�/s using the tailwater of the UTK HEP. The average annual energy production is estimated at 495.148 GWh (Rolwaling not considered) & 543.494 GWh (Rolwaling Considered). Energy generated in the dry and wet seasons is 64.32 GWh (Rolwaling not considered) & 159.454 GWh (Rolwaling considered) and 371.658 GWh (Rolwaling not considered) & 370.502 GWh (Rolwaling Considered), respectively (referring to the energy delivered at Khimti SS incoming terminals). If the Rolwaling Diversion is implemented, the energy yield is expected to increase by 50.0 GWh. The...